1PROK-IVE-1 Single-Packer BHA for Wells Operation with Submersible Electric Pump with Simultaneous Isolation of Leak Interval Located Above (rated up to 5000 psi)

Open PDF catalog
Download ZIP
Ask a question Make an order

1PROK-IVE-1 Single-Packer BHA for Wells Operation with Submersible Electric Pump with Simultaneous Isolation of Leak Interval Located Above (rated up to 5000 psi)



1PROK-IVE-1 Single-Packer BHA for Wells Operation with Submersible Electric Pump with Simultaneous Isolation of Leak Interval Located Above (rated up to 5000 psi)

It is used for pumping production of oil with simultaneous isolation of a leak interval located above with water inflow in production strings casing OD from 5 1/2’’ to 7’’ in.

Ask a question Make an order

BHA APPLICATION ALLOWS

  • to turn the well back on after a non-production or shutdown period due to a high water-cut of the product, to put the well back to the stock of producing wells; 
  • to develop the well drainage area with the maximum possible output of hydrocarbon reserves;
  • to isolate a water inflow or leak interval in a fast, reliable and cost-effective manner;
  • to avoid expensive remedial works (cost savings up to 1 mln rub.).

ADVANTAGES

  • reliable isolation of the production string leaking section;
  • attachments:
    • safety assembly enables to release the packer in case of complications related to its head padding thus enhancing the safety during workover and emergency works;
    • check flush valve provides conditions for wells production with minimum possible complications and maximum oil flow rate. The valve enables to flush the pump cavity in the course of well production or to treat the pump with various chemical agents;
    • makes the assembly of the BHA possible at subzero temperature of the environment.

TESTIMONIALS

  • Testimonial from “Samaraneftegaz” OJSC
  • Testimonial from “Samotlorneftegaz” OJSC

ARTICLES ABOUT PRODUCT

  • Oil. Gas. Novation 12.2012 “Technologies and equipment to reduce expenses in squeeze cementing”

SPECIFICATIONS

Code Casing BHA OD, in BHA ID, in, not less than NUE connection thread*
OD, in Nominal Weidht, lb/ft Top (box) Bottom (nipple)
1PROK-IVE-1-118-Х1 5 1/2” 15.5-17.0 4.65 2 2 7/8”
5 3/4” 20.0-24.5
1PROK-IVE-1-122-Х1 5 3/4” 15.5-20,0 4.8
1PROK-IVE-1-142-Х1 6 5/8” 20.0-28.0 5.6 2.36 3 1/2” 2 7/8”
7” 35.0-38.0
1PROK-IVE-1-152-Х1 7” 23.0-29.0 5.98

* Other threads are available upon request.
1 Configuration number

Sample order code for BHA of the first configuration:
1PROK-IVE-1-118-1 where:

1PROK - single-packer BHA by SPF “Paker”
IVE - for isolation of the leak interval located above in the production string when the well’s operated with submersible electric pumps;
1 - one emergency disconnection assembly;
118 - BHA OD;
1 - the first configuration.

Sales

Dinar Sufiyanov
Dinar Sufiyanov
Director of sales development
+7 (34767) 5-21-01
+7 937 318-87-56
Skype: ved-paker
Timur Minnivaleev, Ph.D
Timur Minnivaleev, Ph.D
Deputy director for external relations
+7 927 468-33-87

 

E-mail: info@npf-paker.com

E-mail: info@npf-paker.com

7, Severnaya Str., Oktyabrsky,Republic of Bashkortostan, 452606, RUSSIA

© 2009-2025 Paker Science and Production Firm

7, Severnaya Str., Oktyabrsky,
Republic of Bashkortostan, 452606, RUSSIA