Two-packer system for dual injection (rated up to 5075 psi) 2PROK-ORZ
Two-packer system for dual injection (rated up to 5075 psi) 2PROK-ORZ

Two-packer system for dual injection (rated up to 5075 psi) 2PROK-ORZ
THE SYSTEM USAGE ALLOWS:
- carrying out the water injection to several production intervals via one borehole;
- significantly reducing the capital expenditure and operating costs during the construction and operation of waterflooding patterns in oilfields;
- installing and removing the systems during one tripping.
ADVANTAGES:
- dual injection via one OWT elevator;
- change of the outlets by the geophysical elevator during one tripping;
- implementation of the integrated researches - general researches as well as of each reservoir sepa- rately;
- geophysical researches of the injectivity profile of the lower reservoir with the outlet from OWT;
- measurements of injection flow and pressure with the help of standart geophysical equipment;
- there is no need to use the downhole systems and wireline technique;
- the divider installation can be implemented with its dumping into the casing of OWT.
Code |
Casing |
BHA OD, in |
BHA ID, in (not less than) |
Maximum temperature, F |
NUE connection thread* | ||
OD, in |
Nominal Weight, lb./ft |
Top (box) |
Bottom (nipple) | ||||
2PROK-ORZ-1-118-Х1 |
5 1/2” |
15.5-17.0 |
4.65 |
2.32 |
302 |
2 7/8” |
2 7/8” |
5 3/4” |
20.0-24.5 | ||||||
2PROK-ORZ-1-122-Х1 |
5 3/4” |
15.5-20 |
4.8 | ||||
2PROK-ORZ-1-140-Х1 |
6 5/8” |
28.0-32.0 |
5.51 |
3 1/2” | |||
2PROK-ORZ-1-142-Х1 |
6 5/8” |
20.0-24.0 |
5.59 | ||||
7” |
35.0-38.0 | ||||||
2PROK-ORZ-1-145-Х1 |
6 5/8” |
20.0 |
5,71 | ||||
7” |
23.0-35.0 |
* Other threads are available upon request.>
1 Configuration number.
Sales

