|
|
|
|
|
|
|
YAKPRO-CPG-1 Anchor BHA for well operation with ESP units
It is designed for operation of the wells with high gas ratio well fluid with submersible pump equipment. It allows to operate with the closed tubing using APG gaslift effect for production strings with nominal outside diameter of 140-178 mm.
|
|
|
|
|
|
|
|
|
|
|
MRG Hydraulic Split Sleeve
It is designed for disconnection of the tubing string in case of complications with tripping the downhole equipment in and out.
|
|
|
|
|
|
|
IPM Mechanical Setting Tool
It is designed for the tubing string connection and disconnection with the stand-alone packer and anchor equipment in the production string.
|
|
|
RKU General-Purpose String Disconnector
It is designed to set and disconnect a tubing string, to provide a movable pressure-tight connection between the tubing string and packer and anchor equipment in the production string as well as to retrieve this equipment.
|
|
|
IPG Hydraulic Setting Tool
It is designed for installation, disconnection and connection of the tubing string with the stand-alone packer and anchor equipment in the production string.
|
|
|
PB Safety Sub
This sub is designed to easily disconnect tubing from stuck downhole equipment during well operations.
|
|
|
|
|
|
|
|