Packers with cable entry P-EGM, P-EMO
- Mechanized stock with ESP.
- Wells with non-tightness of production casing laying above oil production zone.
Range of application:
- Isolation of non-tightness intervals of production casing
- Gas removal from the space under the packer
Assignment:
- The cable line does not break
- Armor of the ESP cable doesn’t need to be removed
- Cable installation at the wellhead
- No additional training of personal is needed
- Hydromechanical or axial set packer
Benefits: